Full Turnkey Package for Coleg Meirion-Dwyfor

Published by in Acousto Booths ·
Tags: WeldingExtractionEducationTurnkey
This was a challenging project for the Weld Safe team as we only had 6 weeks to complete the full package from initial design, to manufacture and then installation.

We were initially contacted by KM Construction, who are Coleg Meirion-Dwyfor's main contractors, to assist with the refurbishment of the colleges welding bays. After seeing the Weld Safe Acousto Booths, the college decided that they were the right choice for them and requested that they be made to fit into their existing workshop space.

As part of the refit, we designed, manufactured and installed Acousto Bays with viewing windows and sliding strip curtain entrances as well as training benches which included fire bricks for gas welding.

Gas manifold and pipelines were installed using Gas Arc distribution manifolds and regulators in accordance with the British Gases Association (BCGA) codes of practice. A Nederman fume extraction system, featuring telescopic fume arms in each bay and a stand alone arm in the main area was also installed.

With a lot of hard work from all of the Weld Safe team we completed the project on time - another successful turnkey package and a happy customer!